| The Kilo-Lab facility
was installed in 2004 to bridge the gap in capacity between
laboratory and Pilot Plant and to provide the means for offering
manufacture of smaller volume high-value added products. In
particular, the facility was designed with the developmental
and preclinical needs of the pharmaceutical industry in mind. |
| |
| The unit is housed separately
from the laboratory but close enough to our Pilot Plant to access
all of the Pilot Plant facilities, such as scrubbers and abatement
and vacuum. The facility is operated in accordance with ISO
standards; the objective being to provide early phase
trial materials on minimum lead times with more flexibility
and at less cost than equivalent fully GMP units. |
|
| |
| Kilo-Lab in Summary: |
| |
|
|
| |
 |
20 L Glass Assembly |
| |
 |
Temperature range from 30 to 300°C |
| |
 |
50 L Glass Assembly with Distillation. |
| |
 |
5 L Fractional Distillation unit. |
| |
 |
2 L Hydrogenators 3 nos. |
| |
 |
Full access to Pilot Plant facilities - vacuum & abatement
|
| |
 |
Vacuum Oven for drying low melting solids. |
|
| |
|